Type
Environment
Local
Angola
State
Finished
Client
SONANGOL – Refinaria de Luanda, S.A.
- Services provided included a well-founded assessment of the Environmental Impact Study (EIS) concerning the contract for the design and construction of the Combined Cycle Power Station at the Luanda refinery, based on a preliminary determination of the most important issues to be addressed in the EIS, such as:
• Impacts to be further examined and method to be used, especially in the case of more significant impacts;
• Type of alternatives to be examined in detail, as well as measures to mitigate the impacts.